Silt Separation Project – Miami ICE Gold Coast

HB60-Silt-Separator-Water-Clarification-PR-Power-Gold-Coast-Australia-3

Background

A water project in Miami, Gold Coast has been called to a stop due to heavy silt and dissolved metals residing in the water preventing it from being discharged from the site.

Objective

The PR Power Water solutions team has been called to isolate the problem and find a solution as quickly as possible. After meeting up with our client on site the team was able to figure out the solution and the necessary equipment and expertise can be implemented to get the site up and running again.

Solution:

The PR Power team set up a water treatment system which was up and operational within 24 hours. Our Silbuster HB60 was installed treating up to 40,000ltr/hr of very low pH water with 1000ntu turbidity, The system is a multistage chemical dosing operation, the chemicals are automatically dosed to achieve optimum results, the pH was stable and within range with 99% removal of turbidity.

Equipment used > Siltbuster HB60


Gallery



Back to all case studies