Underground Dewatering, Construction Site, QLD

Dewatering Construction Site Queensland Australia

Background 

An underground dewatering project on a commercial building site located in Labrador, North Gold Coast, QLD.

Objective

Set up a dewatering system for the job site during the construction of the basements and the first 4 storeys of a high rise building.

Control solids, pH and metals using an automatic dosing system to comply with the dewatering management plan.

Solution

PR Power provided a system which automatically dosed chemicals for pH control and aerated the water to oxidise the dissolved metals.

3 HB60 Clarifier units were supplied to remove the high concentration of suspended solids using settlement.

  • HB60’s operating parallel are able to achieve a higher flow rate.