Background 

An Underground Infrastructure project in Pallara QLD needed to install several kilometres of piping.

Underground water found during the excavation needed to be treated to meet the Dewatering Management Plan.

Objective

Treat the water with high turbidity and control pH to meet discharge criteria in order to pump the water from site.

The system needed to be mobile in order to move the unit along with the project progress every few weeks.

The system also needed to be stand alone as the location was remote.

Solution

PR Power supplied a Water Treatment system including a HB60 Silt Separator and an automatic Dosing Skid System to treat the underground water for safe discharge.

The automatic Dosing Skid System was supplied for pH correction and flow proportional dosing/turbidity control in a remote location.

The Dosing Skid System included online monitoring to provide high levels of operational reporting and recording live information for pH, turbidity, flow and chemical levels.

  • Turbidity reduced from >500 NTU to <20NTU.
  • pH controlled between 6.5 and 8.5 pH.

Explore the PR Power HB60 Silt Separator >

 